621 Capitol Mall, Sacramento, CA
300,000 SF, 400 ft tall, spec office building. Twenty-five occupied floors above eight-level parking garage. Mechanical engineer, design build by FMB Design Build. CD: '07
Cathedral of Blessed Sacrament Restoration, Sacramento, CA Complete renovation of a 110 year old multi-story cathedral. This 44,300 SF design assist project includes new HVAC and plumbing systems. FMB installed under floor air distribution, high efficiency evaporative condensing rooftop chiller, two 10,000 cfm indoor air handlers and twelve fan coils. Commercial kitchen, complete DDC system and special baptismal plumbing system. CD: '05
Stockton Arena, Stockton, CA, Indoor event center. This 220,000 SF, 10,000 seat venue will host sport and entertainment activities. FMBDBC engineered and installed complete mechanical, plumbing and control systems. CD: '06
A.G. Spanos Co., Stockton, CA Class A headquarters office facility. FMBDBC engineered and installed mechanical and BAS systems on this 5 story building which includes a roof top helicopter filtration and fuel retention system. CD: '05
Stockton Ball Park, Stockton, CA Class A ball park. FMBDBC installed complete mechanical, plumbing and control systems. CD: '05
Meridian Plaza, Sacramento, CA Class A office building. A 240k SF, 12-story office building with built-up mechanical penthouse and 65k SF subterranean parking. FMBDBC designed and installed complete mechanical, plumbing and control systems. CD: '03
Mondavi Center, Davis, CA Performing Arts facility at UC Davis. FMB provided plumbing, hydronic piping and site distribution systems. CD: '02
Rolling Hills Casino, Corning, CA Indian reservation gaming facility. FMBDBC designed and installed complete mechanical and plumbing systems for this 50k SF casino. CD: '02
Raley Field, West Sacramento, CA AAA baseball facility. FMBDBC designed and installed HVAC, plumbing, ASM under a 6 month schedule. CD: '00
MBA Research Institute, Monterey, CA Aquarium expansion. FMB provided mechanical, plumbing and piping for this 50k SF R and D building for submersible testing. CD: '00
MBA, Monterey, CA New exhibit life support systems. FMB provided seawater piping, chilled water piping, centrifugal pumps, sand filters, ozonation system, fractionator towers, boilers, chillers, and vertical aeration towers for this new exhibit. CD: '99
Monterey Bay Aquarium Light and Dark Exhibit, Monterey, CA
Life support system for the new exhibits, including seawater
piping and chilled water piping. Installation of 12 Fybroc
centrifugal pumps, 8 vertical sand filters, ozonation system,
fractionator towers, boilers, chillers, plate heat exchangers and
vertical aeration towers. CD: '99
621 Capitol Mall, Sacramento, CA 300,000 SF, 400 ft tall, spec office building. 25 Occupied Floors above Eight Level Parking Garage. Mechanical engineer, design build by FMB Design Build. CD: ‘07
Feather Falls Casino, Oroville, CA
19, 570 SF design build, three-story, 84 room luxury hotel for Feather Falls Casino. Project consisted of mechanical, plumbing, fluid cooler, boiler and pumps in penthouse mechanical room and other special features. CD: ’07
|
|
|
|
|