Wild Goose NG Storage, Gridley, CA Natural gas facility. FMB fabricated and installed High Pressure ASME Code piping for well heads. Work was performed under strict environmental controls governing this National Wildlife Refuge location. CD: '02
Calpine Power, Yuba City, CA Office, warehouse and turbine facility. FMB installed mechanical and fire systems for administrative areas and performed repair work on the steam turbine and steam condenser. CD: '01
Knauf Fiber Glass, Redding, CA Manufacturing facility. FMB fabricated and installed process and power Piping and equipment installation for this large, new plant. Systems installed included; process water, compressed air, combustion air, and natural gas. CD: '01
UNR Fire Science Academy, Carlin, NV 12 building state-of-the-art fire and hazardous materials training facility. FMBDBC designed and installed the underground firewater and dual contained fuel oil distribution systems involving 14 fire training pads. Makeup water was provided by wells feeding 6, 2 million gallon ponds and pumped to 6, 750 HP vertical turbine pumps. CD: '99
Rio Pluma LLC, Gridley, CA Prune Juice Processing Facility . The Owner disassembled and shipped holding tanks, pumps, heat exchangers, and controls from another location to this facility. FMB re-assembled process systems and added process piping and structural steel platforms to interconnect operating components. CD: '99
|
|
| |

Other Projects:
Kikkoman Foods, Folsom, CA — Food processing facility.
FMB installed piping systems for the Koji Bed and Shikomi Tank
consisting of; compressed air, high-pressure water, process
water, food conveying pipe, hydronic piping, and duct systems.
CD: '00
Sunwest Mill, Sacramento, CA — Rice processing
mill. FMB provided plumbing, compressed air, natural gas and
HVAC systems. CD: '00
|
|
|