|
|
 |
Oak Park Cancer Research Center, Sacramento, CA Biophotonics research facility. FMB/DBC designed and built the process plumbing, process piping, hydronic piping, specialty exhaust and HVAC systems. CD: '05
Oak Park Cancer Research Center, Sacramento, CA Biophotonics research facility. FMB/DBC designed and built the process plumbing, process piping, hydronic piping, specialty exhaust and HVAC systems. CD: '05
Modesto Memorial Medical Center, Modesto, CA, Medical facility addition including a 7 story tower, 3 story central plant and a utilidor underground system. FMB is fabricating and installing complete mechanical systems for this major hospital project. CD: '07
Sutter North MOB, Phase B, Yuba City, CA FMB designed and installed HVAC, medical gas, plumbing, piping and controls for two-story, 60,000 SF OSHPD-3 steel framed outpatient surgery center and medical office building. High efficiency evaporative condensing rooftop units. CD: '05
Sutter North MOB, Phase A, Yuba City, CA medical office building and urgent care facility. FMB/DBC designed and built the plumbing and HVAC system. CD: '01
Kaiser 1680 Medical Office Building, Roseville, CA FMB/DBC converted single-story unimproved office shell to retail optical, pharmaceutical, IT service rooms, secure records storage and office space per Kaiser Design Build criteria. CD: '04
Kaiser Hospital, San Francisco, CA Medical office building. VSM fabricated and installed flashing, louvers, soffit and wall panels. CD: '00
Sutter Hospital, Roseville, CA Multi-wing new hospital including a central utility plant, office, surgery, lab and recovery facilities. FMB design assisted the EOR on this major hospital project and installed complete mechanical systems and metal roofing. CD: '97
Blue Shield, El Dorado Hills, CA, office building. FMB/DBC designed and built the plumbing and HVAC system. CD: '01
UC Davis Ellison Building, Sacramento, CA Medical office and lab facility. VSM installed honeycomb sunshades, aluminum and stainless steel handrails and other ornamental metal. CD: '99
Novato Community Hospital, Novato, CA Multi wing new hospital campus. VSM fabricated and installed flashing, metal roofing, louvers and expansion joints. CD: '00
|
|
| |

Other Projects:
Kaiser Permanente, Vacaville, CA — Project consists of underground hydronic piping (heating, chilled and steam) plumbing and medical gases from a new central plant to the new hospital. FMB provided plan and spec with precon assistance. CD: '05
Sutter Lakeside, Lakeport, CA — surgery
and emergency medical center. FMB fabricated and installed
complete mechanical systems and the architectural sheet metal.
CD: '01
Mercy Hospital, Carmichael, CA — hospital renovation and addition. FMB
fabricated and installed complete mechanical systems, including underground utilities
and central utility plant. CD: '98
Fairchild Medical Center, Yreka, CA — single-story
hospital. FMB fabricated and installed complete mechanical
systems. CD: '96
V.A. Hospital, Reno, NV — Five-story ambulatory center.
FMB fabricated and installed air side mechanical systems.
CD: '99
Sutter Auburn Faith Hospital, Auburn, CA — surgery and
patient remodel. FMB/DBC designed and built mechanical systems.
CD: '97
|
|
|