San Mateo County Youth Center, San
Mateo, CA
A 7 building county detention complex including; secured
housing, recreation, administration and courts facilities.
Valley installed 100,000 sq ft of metal roofing as well as
flashing, coping, expansion joints and wall panels. CD: '06
Secure Treatment Facility, Coalinga, CA State detention hospital complex. This 1.2 million sq ft, 40+ building facility includes a 1500 bed hospital and will generate over 2,000 jobs. FMB installed 1 million pounds of duct work and performed HVAC and site utility piping. CD: '05
Federal Correctional Institution, Herlong, CA Federal Prison complex. This 700 thousand sq ft multi-building facility was one of the first federal prisons performed under a design build contract. FMBDBC completed the metric system based HVAC design and energy analysis within a 4 month window. FMBDBC installed HVAC systems at this remote facility. CD: '03
|
|
| |

Other Projects:
State Prison, Atwater, CA — Remote prison facility. This
project included 7 housing units, 7 guard towers, 9 support
buildings, 2 housing buildings, a central plant, and a receiving
building. FMB installed the HVAC systems. CD: '00
Juvenile Facility, Visalia, CA — County detention
facility. A central plant and extensive underground utility
systems were installed to serve new housing units. FMB performed
the complete mechanical systems. CD: '98
Correctional Facility, Lovelock, NV — State prison
unit. FMB installed HVAC systems. CD: '98
State Prison, Corcoran, CA — Multi-building prison
complex. FMB installed HVAC systems for this high security
prison. CD: '98
|
|
|